The "disaster recovery team" is still at work with the room that was damaged by the water leak. Here are some pics of phase 1: the floor and portions of the walls were ripped up. Then the guys put in these huge fans and dehumidifiers to dry everything up. These had to run for several days - cannot wait to see the electric bill for this month. It is taking much longer than I expected to get this room back to normal.